04Stage 04 of 05 — Install

Single-day tear-off. Dry by sundown.

On install day, the crew arrives at 6:30 AM with a job-board, a tarped lawn, and a magnet roller already on the truck. Most residential roofs are torn off and dried-in the same day — and every layer is photographed before the next one covers it.

Duration
1–4 days typical
Owner
Quality crew + lead
Deliverable
Layer-by-layer photo log
Stage
04 of 05
Install stage
01

Single-day tear-off and dry-in

We don't leave a deck exposed overnight. The crew is sized to the slope and square footage so that tear-off, deck repair, and synthetic underlayment dry-in all happen in one daylight window — typically 6:30 AM to 6 PM on a 25-square home.

Inside the stage
  • Crew sized to finish dry-in same day
  • Synthetic underlayment, ice-and-water at valleys/eaves
  • Deck repair photographed and itemized
  • Tarps on truck for any weather surprise
02

Layer-by-layer photo log

Before each layer is covered, the foreman shoots a photo set: bare deck, deck-repair zones, underlayment, ice-and-water, flashing, field shingles, ridge cap. The log is filed with the warranty and lives with the property.

03

Daily owner report

Every evening at 6 PM, you receive a 3-photo text from your project lead: today's progress, tomorrow's plan, any decisions you need to weigh in on. No surprises, no silent days.

Inside the stage
  • Evening text + photo summary
  • Property protection re-set each night
  • Magnet sweep of yard and drive daily
  • Decision points flagged 24 hours ahead
What you walk away with

Stage 04 outputs.

Tear-off
Single day
Dry-in
Before sundown
Photo log
All layers
Daily report
6 PM, texted
Before
After
CASE-0421 · Day 0
Day 4 · dry-in complete
Owners ask

About stage 04.

Do you protect landscaping?

Yes. Tarps on every bed line, plywood walkways over high-traffic turf, and tarped catch zones below every eave.

What if it rains mid-install?

We dry-in immediately with synthetic underlayment and tarp seams. The deck is never left exposed. Re-start within 24 hours of dry weather.

How loud will it be?

Loud — tear-off is the noisiest day. We give the neighbors a one-pager 48 hours ahead and keep the start time to 7 AM in residential zones.