Demonstration site
EFive stages, one chain of custody

From inspection
to notarized warranty.

Every Quality Roofing project follows the same five-stage process — whether it's a single repair or a 60,000-square-foot commercial deck. Each stage is documented, photographed, and signed off by a project lead before the next begins.

What stays the same on every job
Salaried crews

No subs. No commission. No incentive to cut corners.

Single chain of custody

One project lead from inspection to warranty.

Photo-logged at every layer

Deck, underlayment, flashing, field. All filed.

Manufacturer pre-approval

Assembly signed off before contract.

01
Duration
48 hr response
Owner
Project lead
Deliverable
Inspection report (PDF)
Stage 01 of 05

Inspect.

We see the roof before we sell anything.

On-site assessment within 48 hours of request. Drone scan, attic moisture map, structural deck check. Photographic report delivered same day — yours to keep whether or not you hire us.

Checklist
  • Drone + on-roof walk
  • Attic moisture map
  • Same-day PDF report
  • 184-frame photo log
02
Duration
3–5 days
Owner
Estimator + Mfr rep
Deliverable
Signed scope + spec sheet
Stage 02 of 05

Specify.

Engineered to code, sealed by manufacturer.

System designed against local wind/hail rating and architectural intent. Manufacturer pre-approves the assembly. You receive a fixed-price proposal — no allowances, no surprises.

Checklist
  • Code & wind/hail review
  • Mfr-approved assembly
  • Fixed-price proposal
  • Material schedule
Quality Roofing crew installing
03
Duration
14 day lead
Owner
Production manager
Deliverable
Confirmed start date
Stage 03 of 05

Schedule.

Materials at our yard before your start date.

Materials staged, crew assigned, weather window confirmed. Average lead time from contract to start: 14 days. You meet your project lead one week before kickoff.

Checklist
  • Materials staged
  • Salaried crew assigned
  • Weather window locked
  • Pre-start owner meeting
04
Duration
1–4 days typical
Owner
Quality crew + lead
Deliverable
Layer-by-layer photo log
Stage 04 of 05

Install.

Single-day tear-off. Dry by sundown.

Single-day tear-off and dry-in on most residential. Photo log at every layer — deck, underlayment, flashing, field. Daily progress text + photo report to the owner.

Checklist
  • 1-day tear-off & dry-in
  • Layered photo log
  • Daily owner report
  • Site cleaned each evening
Before
After
CASE-0421 · Before
After · Day 11
05
Duration
Day of completion
Owner
Project lead + notary
Deliverable
Warranty packet + flyover
Stage 05 of 05

Warrant.

Notarized. Filed with the property.

Final walk-through with owner. Notarized lifetime workmanship warranty. Manufacturer registration submitted. Final drone flyover. Warranty filed with the property — transfers to the next buyer.

Checklist
  • Notarized workmanship warranty
  • Mfr registration filed
  • Final drone flyover
  • Property-filed transfer
Typical residential timeline

21 days. Contract to warranty.

Day 0
Inspect
Day 2
Specify
Day 7
Schedule
Day 14
Install
Day 21
Warrant
Stage 00

Start with the inspection.

48-hour response. Same-day photo report. Yours to keep — whether or not you hire us.

No obligation · 2 hr reply